VM Systems, Inc.

Menu

Skip to content
  • Home
  • Solutions
  • Safety
  • Case Studies
  • News
  • About Us
  • Contact

Case Studies

 

 

  • Filter Results:

    • Architectural
    • BIM/3D
    • Case Study
    • Custom Fabrication
    • HVAC
    • Industrial
  • Renaissance Hotel Downtown Toledo

    Case Study, Custom Fabrication

  • Bowling Green State University – Moseley Hall Renovation

    Case Study, HVAC

  • SYLVANIA – MERCY E.D.

    HVAC

  • The Anderson’s New Corporate Headquarters

    HVAC

  • LAZBOY

    HVAC

  • Mercy Perrysburg Oncology

    HVAC

  • ProMedica Health and Wellness

    Architectural, HVAC

  • Toledo Lucas County Public Library King Road Branch

    HVAC

  • Mercy Oregon MOB

    HVAC

  • Mercy St. Charles Hospital – 90 Bed Behavioral Health Addition

    HVAC

  • Hollywood Gaming At Dayton Raceway

    HVAC

  • UT Nitschke

    Architectural

  • New Senior Living Facility – St. Clare Commons

    HVAC

  • Mercy Perrysburg

    BIM/3D

  • Plenum Elbow

    Custom Fabrication

  • Specially Fabricated Boxes

    Custom Fabrication

  • Steel Plant

    Industrial

  • Dust Collection System

    Custom Fabrication

  • Production Plant Design Build

    Industrial

  • Water Jacketed Table

    Custom Fabrication

  • Ballas Buick / GMC

    Architectural

  • Stainless Steel Exhaust Hood

    Custom Fabrication

  • Steel Grain Chute

    Custom Fabrication

VM Systems
  • VM Systems
  • 3125 Hill Avenue
  • Toledo, Ohio 43607

To learn more or become a customer, contact us:

419.535.1044
  • Home
  • Solutions
  • Safety
  • Case Studies
  • News
  • About Us
  • Contact
Join our mailing list:

Follow us on

LinkedIn

Copyright © 2025 VM Systems. All rights reserved. Terms & Privacy.